Russia gets permission for survey work on 162 km Rasht–Astara railway in Iran

Russia's Ambassador to Iran, Alexey Dedov, said the Russian side has received permission to carry out engineering and technical survey work along the entire length of the 162-kilometre Rasht–Astara railway. Musavat reports that all land along the line has been handed over and that search work is accelerating.

The report mentions a corresponding protocol, but the available text is cut off, so its date and other details are not given. The article provides no further information on the project's timeline, costs or next steps.

Follow us on Telegram @weareturks_news_en

This story was automatically summarised and translated from Musavat. All rights to the story belong to its source.

Related news

Uzbekistan
Transport & Infrastructure

Uzbekistan–Kazakhstan Gishtkuprik border checkpoint reopens after reconstruction

The Gishtkuprik border customs checkpoint between Uzbekistan and Kazakhstan, formerly known as Chernyayevka and called Zhibek Zholy on the Kazakh side, reopened on 25 November after almost two years of large-scale reconstruction. The official ceremony was attended by Deputy Prime Minister of Uzbekistan and Minister of Economy and Finance Jamshid Kuchkarov, Kazakh Finance Minister Madi Takiyev, and heads of customs authorities. After a ribbon-cutting and performances by musical groups from both countries, the border was opened for crossing at 4 p.m.

Gazeta.uz
Follow us on Telegram Tools

🔔 Don't miss the big stories

Get a notification on your phone or computer when something important happens in the Turkic world.

Which notifications would you like?