Uzbekistan begins second phase of $320 million rural infrastructure project

Uzbekistan begins second phase of $320 million rural infrastructure project
Photo: UzDaily

Tashkent hosted a review of the Rural Infrastructure Development Project (RIDP), implemented in 2019–2026, and presented plans for its continuation as RIDP-2. The Ministry of Economy and Finance, together with the World Bank Group, held a conference on 4 November to discuss the results of the first phase and the move to the next stage.

During the first phase, about 900 infrastructure projects were carried out in 306 mahallas across five regions. These included more than 340 roads, 220 power supply systems and 160 water supply systems, along with about 100 renovated schools, 40 preschool institutions and 10 bridges. Around 1 million rural residents benefited directly, nearly half of them women.

The total budget for RIDP-2 is $320 million. The World Bank will provide $150 million, the Asian Infrastructure Investment Bank (AIIB) $100 million, and the Uzbek government $70 million. The second phase will cover 296 mahallas in six regions and is expected to benefit about 1.2 million rural residents by 2031, including 600,000 women and 300,000 young people. The programme also aims to expand economic opportunities through entrepreneurship support and new jobs, with shared centres planned for entrepreneurs in 15 pilot mahallas.

🧭 TravelTashkentTashkent, the capital of Uzbekistan and the most populous city in Central Asia, brings together Silk Road... Follow us on Telegram @weareturks_news_en

This story was automatically summarised and translated from UzDaily. All rights to the story belong to its source.

Related news

Sakha (Yakutia)
Transport & Infrastructure

Yakutia proposes cutting federal air subsidy route limit from 1,000 km to 600 km

Sakha Republic's State Assembly, Il Tumen, has proposed revising the conditions of a federal program that subsidises air travel between districts, so that all settlements in the Arctic districts have year-round flights. Under the main proposal, the maximum route length would drop from 1,000 km to 600 km, allowing all 14 socially significant Arctic routes to be included.

YSIA Sakha
Follow us on Telegram Tools

🔔 Don't miss the big stories

Get a notification on your phone or computer when something important happens in the Turkic world.

Which notifications would you like?